H Beam Welding Line,Chain Turnover Machine,H Beam Shot Blasting,H Beam Turnover Machine Wuxi Taohua Machinery Technology co.,Ltd , https://www.wxblossom.com
This new device consists of a module consisting of a control system container unit, a quick-installing distance compensation high-pressure rigid process pipe connection device, and a compressed natural gas front high pressure post-dehydration device. It can be flexibly configured according to site conditions. , To achieve the test operations of independent oil and gas wells and independent natural gas wells, and to recover gas that was vented from the regional well network, such as natural gas and natural gas pipelines.
This new device can be rapidly dismantled and transported during construction. Like a small gas processing plant, it can be relocated and installed on the same day, and it can be put into operation on the same day. At the same time, the unit is equipped with a natural gas generator set and no diesel is required. During the production process, its power energy is completely taken from the natural gas at the wellhead, and 60 kilowatts of power can be transmitted to other users and devices at full load. The device has an independent manual, automatic, and remote control mode in the control mode, and can be changed or switched according to production conditions at any time during operation. The device can realize timely video production monitoring without blind spots, advanced ultraviolet fire alarm system, independent fire-fighting system and emergency power system, online fault automatic classification control system, and emergency stop system.
After the new device is put into operation, it can recover a large amount of natural gas for well testing, achieve energy conservation and emission reduction, protect the environment, achieve better social and economic benefits, and provide a solid guarantee for the clean development and conservation of oil fields.
A few days ago, a new device for the recovery of scattered natural gas was developed successfully in the western part of CNPC. During the operation of oil and gas test wells, the vented and burned natural gas can be effectively recovered, which has no precedent in the country.